AFBC BOILER LIGHT UP PROCEDURE PDF

Requirements of Bed material,Charcoal & Diesel. Bed material Maximum Particle size Bulk density Chemical composition MM TO The start up of fluidised bed combustion boilers has always been a subject of the most process of raising bed temperature above °C. In the process of. boilers/heaters is the concept of Fluidised Bed Combustion (FBC). A descriptive feature for Start up/ Firing Procedure for AFBC boiler/heater bed. Initially.

Author: Nelmaran Voodooramar
Country: Turkmenistan
Language: English (Spanish)
Genre: Relationship
Published (Last): 6 September 2005
Pages: 386
PDF File Size: 8.35 Mb
ePub File Size: 5.38 Mb
ISBN: 724-9-24397-948-6
Downloads: 44465
Price: Free* [*Free Regsitration Required]
Uploader: Mijin

Keep the PA lines clear and take trial run of feeder of first compartment. Bed material to be filled and level of defluidised bed should be MM of WC. Check the following valves are kept in open condition.

Turn off the oil burners and remove from furnace. Maintain drum level at normal recommended level. Start the FD fan and maintain bed pressure mmwc.

AFBC ( Atmospheric Fluidized Bed Combustion ) BOILER COLD START UP PROCEDURE – ASKPOWERPLANT

Afbc Boiler Operation Manual – snowman-ro. Check instrument air pressure is available at the required pressure 7 to 7. C and stable the boiler. Afbc Boiler Operation Manual – boiler operation manual at Inspect the boiler before start and check Manual on Boiler Tube Bhel steam generators products afbc boilers Tags: Cethar Afbc Boiler Manual – dire searching for a ebook Cethar afbc boiler manual in Published on Oct View 3.

Related Posts  HAROLD PINTER OLD TIMES PDF

Boiler Manual For Cfbc – boiler operation procedure? Set the air flow to MM of wc P.

Feed control valve and its bypass valve. Light up all the four burners.

Afbc Boiler Light Up Procedure

Boiler Installation – Afbc Documents. Ensure all access doors are closed. Cfbc boiler operation procedure?

Ensure all foreign materials are removed from furnance and pressure parts. Boiler light up procedure A fixed quantity of dry charcoal Kgs i.

Bed oight Maximum Particle size Bulk density Chemical composition: Once fludisation study is completed boiler is ready for light up. C and start the ash handling system. Feed pump and drives. Afbc Boiler Operation Manual – boiler operation procedure 1 seminar afbc boiler operation procedure,Ask Latest information,Abstract,Report,Presentation free download ligt Documents.

Ensure feed water flow through economiser at the time of light up to avoid steaming of economiser. Start the LD oil pump and maintain the oil pressure between 6.

Related Posts  TEORIA GENERAL DEL PROCESO CIPRIANO GOMEZ LARA DOWNLOAD

Ensure all personel were cleared. Ensure all equipment trial to be taken. Check the bed material and fludisation study is being done. CFBC boiler operation procedure? Drum and main line vent. The air flow at which fludisation starts is noted and will be provedure at the time of mixing.

Afbc Boiler Light Up Procedure

procevure Inspect the boiler before start and check the following 1. Start up vent valve. When the bed temperatures reaches Deg C start the drag chain coal feeder. Check for dry fuel MM is available in bunker and gates below bunker are open and fuel is available at feeder inlet.

A fixed quantity of diesel wetted Charcoal 40 Kgs is spread uniformly over the compartment. Shiatsu Massage Manual Afbc boiler boiler, The